
By Steve Ranger
Published: Thursday 19 January 2006
Email story to a Friend | Report Abuse
Name
Anonymous
Location
South East
Occupation
IT Manager
Comment
Um, interesting. Some points raised differ from what the reality.
Trusts are being pushed into CRS with no reguard to existing functionality or cost of moving to the new system.
Choose and Book is a complete failure, with all rollouts being stopped in our area, and existing users being told that they can stop using the system if they want to.
The N3 rollout success depends on what you mean by connected. BT have a different meaning of that phrase than most.
PACS is in, and working with a few glitches. The project was painfull however.
Setting users up on the Spine is a slow and painfull business, with a lot of resistance from users.
The Contact email system is slow and clumbersom, and not very user friendly.
You have missed of a few major national projects, such as the Electronic Staff Record, Shares Business Service and Integrated Comunity Equipment Services, all heading for their own show stopping problems if we're not carefull.
Overall, a nightmare for NHS IT Staff.
Agenda Setters 2009
Welcome to the ninth annual Agenda Setters poll – silicon.com's list of the top 50 most influential individuals in the technology and IT industries, from techies and CIOs to entrepreneurs and business leaders. Find out more in our latest special report.
Copyright © 2008 CBS Interactive Limited. All rights reserved. Top of page
Bob Tarzey Why you must rein in your power users When they do damage, it can be catastrophic to your business
Jon Collins Is losing a mobile device really such a big deal? How to minimise the damage to your business