3 stories on
Sort by: Date | Relevance
whitepaper The largest cost driver is shown to be unnecessary unabsorbed costs resulting from the oversizing of the infrastructure. This paper describes an improved method for measuring Total Cost of Ownership of data center and network room physical...
[25 Apr 2008]
whitepaper The largest cost driver is shown to be unnecessary unabsorbed costs resulting from the oversizing of the infrastructure. This paper describes an improved method for measuring Total Cost of Ownership of data center and network room physical...
[18 Apr 2008]
whitepaper The largest cost driver is shown to be the unnecessary unabsorbed costs resulting from oversizing the infrastructure. The cost drivers for the Total Cost of Ownership of data centers and computer rooms are quantified.
[12 Dec 2007]
Sort by: Date | Relevance
Copyright ©1995-2008 CNET Networks, Inc. All rights reserved. Top of page