White Papers
Exchange Server 2007 Performance Comparison of the Dell PowerEdge 2950 and HP Proliant DL385 G2 Servers
Category: Software and Web Development
Tags: poweredge, x86, server, applications
Overview Different applications put different demands on the various components of a server. Depending on the architecture of a given server, the best configuration for a particular application may vary from system to system resulting in advantages in one platform over another for certain applications or workloads. While the Dell PowerEdge 2950 and the HP Proliant DL385 G2 are both twosocket x86-based servers, they are based on different processor-to-memory interconnect technologies. This difference can result in very different application performance when cost- and energy-efficient one processor configurations are compared.
- Publisher
- Dell
- File Format
- Date Published
- Feb 20, 2008
- Format
- White Papers
- Topics
- Email, Application Servers
Similiar White Papers
Auditing Mailbox Access Using Exchange System Manager and Event Viewer
Sometimes it may be necessary to track who is accessing other mailboxes and when they are doing it. One can determine a
Publisher: TechGenix
Backup Exec 12 for Windows Servers: Agent for Microsoft Exchange
Companies today are facing the ever-increasing challenge of managing the explosive growth of valuable data. The predomin
Publisher: Symantec | Tags: data, email, productivity, revenues
Load Balancing Exchange 2007 Client Access Servers Using Windows Network Load-Balancing Technology - Part 2: Configuring the Windows NLB Cluster
With the environment up and running, the very first thing one want to do is to create a record for the NLB cluster name
Publisher: TechGenix | Tags: active directory, exchange 2007
Migrating From Small Business Server 2003 to Exchange 2003 Standard Part 1 - Preparing Your Network
For the purposes of this paper, the author assumes that the SBS server will be decommissioned at the end of the process,
Publisher: TechGenix | Tags: sbs, server, small business server, windows 2003, windows server
Load Balancing Exchange 2007 Client Access Servers Using Windows Network Load-Balancing Technology - Part 1: Overview of Windows NLB Clusters
This paper show how to load-balance Exchange 2007 Client Access Servers (CAS) using Windows Network Load Balancing (NLB)
Publisher: TechGenix | Tags: downtime, exchange 2007, server
Dell White Papers
Using Red Hat Enterprise Linux AS to Achieve Highly Available, Load-Balanced Clusters
The Red Hat Enterprise Linux AS operating system integrates Cluster Manager and IP Load Balancing, the features that imp
Efficient BMC Configuration on Dell PowerEdge Servers Using the Dell Deployment Toolkit
The on-board baseboard management controller (BMC) is a powerful and flexible device that can be used to effectively man
Publisher: Dell | Tags: management, poweredge
Using NIC Teaming to Achieve High Availability on Linux Platforms
Network interface card (NIC) teaming is one method for providing high availability and fault tolerance in servers. This
Using VMware High Availability and VMotion With Microsoft Exchange Server 2007 Virtual Machines on Dell PowerEdge Servers
When running applications in a virtualized environment, such as VMware Infrastructure 3, there are new capabilities that
Publisher: Dell | Tags: applications, poweredge, server
Remote OS Deployment Using Dell OpenManage Server Assistant 8 and DRAC 4
Administrators can take advantage of the Dell Remote Access Controller 4 (DRAC 4) and Dell OpenManage Server Assistant w
Publisher: Dell | Tags: linux, microsoft windows, operating systems, os, poweredge
Featured white papers
-
The Value of Location Intelligence in the Communications Industry
Public Services are under pressure, the challenge is to do more with less. How do you improve citizen satisfaction, increase cost efficiencies and improve service delivery? The power of location intelligence is helping many local authorities...
-
Best Practices for Translating Customer Satisfaction into Revenue
Today's support organisations are focused on two top-level metrics: financial results and customer satisfaction. For most, it's easy to track financial performance, but customer satisfaction is akin to speaking a foreign language...
-
HP print solutions and 3M
The objective for 3M was to optimize office printing infrastructure at 3M locations worldwide, reduce total cost and environmental footprint. Some of the business benefits acheived by switching to HP print solutions...
-
Check out these top business apps for your iPhone
-
Inside a Microsoft datacentre
-
Green IT without losing your edge
-
Peter Cochrane's latest video blog
-
What you need to know about Windows 7